Hours lost per machine
How long each machine was stopped, in micro-stops, in setup or below pace.
In a one-week free demo, Mestti measures one department during normal work and shows how much time is lost, why, what it costs and what to do first.
How long each machine was stopped, in micro-stops, in setup or below pace.
The ranking of stop reasons, with the times they repeat.
Losses converted into money, using the hourly value you set.
The first actions, in order of impact, for the team to carry out.
Someone on your team to follow the installation and the conversations.
To install the sensors on the chosen department’s machines.
Production runs as normal. The more realistic the routine, the more useful the result.
Enter one department and what a machine hour is worth to you. The math shows the value of recovering part of the time. The assessment measures the real number.
Sensors are ready within 7 days and installation takes 1 day. After that, you use Mestti for a 1-week free demo before deciding.
There is no need to touch the machine’s controls. Installation is scheduled with your team so it doesn’t disrupt the shift.
With the result in hand, you decide whether to continue with Mestti in that department, expand to others or stop there. The decision is yours, based on the measured number.
Leave your contact and we will schedule the demo at the best time for you.
Prefer to talk now? WhatsApp · (43) 99109-5035