Shop-floor terms, without the jargon.
Short definitions for anyone who wants to speak the same language as production, planning and quality.
Termos
- Production reporting
- A record of what happened in production: how much was made, on which order, by whom and how long it took. In Mestti, quantity and time come from the sensor and the operator gives the reasons.
- Hidden capacity
- Output the factory could already achieve with its current machines and people, but loses in short stops, waiting, long setups and slow pace. It differs from idle capacity, which is a lack of demand.
- Cycle time
- The time a machine takes to complete one production cycle. Compared with engineering’s standard cycle, it shows whether the machine is on pace.
- Availability
- The share of planned time in which the machine is actually producing. Stops, setups and waiting reduce availability. It is the first factor of OEE.
- ERP
- Enterprise resource planning: sales, purchasing, inventory, finance and tax. It records what was sold and invoiced, but not what happens minute by minute at the machine. MES or ERP?
- MES
- Manufacturing execution system: follows production on the shop floor, between the order and delivery: machine queues, reporting, stops, indicators and quality.
- Micro-stop
- A short stop of seconds or a few minutes that is almost never written down by hand. Added up over a shift, micro-stops often hide a lot of time.
- MTBF
- Mean time between failures (stops). The higher it is, the longer the machine runs without interruption.
- MTTR
- Mean time to repair: the average duration of stops. It shows how long the factory takes to get back to producing after something stops.
- Non-conformity
- A part or process outside the specification. In Mestti, scrap and rework are recorded and count in the machine’s quality indicator.
- OEE
- Overall equipment effectiveness: availability × performance × quality. It combines downtime, below-target pace and bad parts in one number. How to calculate it
- Production planning and control
- Production planning and control: decides what to make, on which machine and when, and checks whether the plan is being followed.
- Parts per cycle
- How many parts come out each time the machine completes a cycle. With a 4-cavity mold, it’s 4. Together with cycle time, it sets the hourly target.
- Performance
- How much the machine produced compared with what it should have produced while it was running. It is the second factor of OEE.
- Quality (in OEE)
- The share of parts produced that came out good, with no scrap or rework. It is the third factor of OEE.
- Scrap and rework
- Scrap is a discarded part; rework is a part that has to be redone or fixed. Both consume machine time without producing good output.
- Scheduling
- Deciding the order in which operations go into each machine, with expected start and finish. How it works in Mestti
- Setup
- Preparing the machine for a new product: changing a mold or tool, or adjusting settings. Long or frequent setups reduce availability.