When the routing lives in one person’s head, the factory stops when that person is away. In Mestti, engineering records components, operations, machines and times. That becomes the production order, the machine queue and the operator’s target.

Calculate a target

Everything production uses starts here.

Product

Components and materials

Each product with its components, material, dimensions, weight and unit cost.

Process

Operations in sequence

The order of operations, the machine for each and the alternative machines when the main one is busy.

Time

Cycle, parts per cycle and setup

The time for one cycle, how many parts come out per cycle (mold cavities, for example) and the preparation time.

Planning

Orders and scheduling

Orders are created with their operations and the expected duration of each on each machine.

See planning

Shop floor

Hourly target

The operator’s target comes from the cycle engineering defined, not from a number picked that day.

Calculate a target

Cost

Product costing

Material, machine time and setup add up in the costing, with real production time to check the margin.

How to price it

The operator’s target comes from engineering, not guesswork.

With the cycle time and parts per cycle, the hourly target is simple math, the same for everyone. When a machine falls short, the question stops being “who got it wrong?” and becomes “what happened?”.

Target per hour600
In an 8-hour running shift4.800

Formula: (3,600 ÷ cycle time, rounded down) × parts per cycle. A multi-cavity cycle counts as a whole, as Mestti does.

What changes when engineering lives in the system.

The factory doesn’t depend on one person

Vacations, shift changes or an experienced person leaving don’t erase the right way to do it.

Delivery dates based on reality

Planners add up times that really exist, per machine, instead of estimating how long an order takes.

Pricing with real time

Costing uses standard time; production shows real time. The gap shows up before it becomes a loss.

What people ask about product engineering.

Is Mestti a CAD or PLM tool?

No. Mestti doesn’t design parts. It records the manufacturing structure: the components, operations, machines and times the shop floor and planners use every day.

What are parts per cycle?

It’s how many parts come out each time the machine completes a cycle. With a 4-cavity mold, for example, one cycle produces 4 parts. Mestti uses it to calculate targets and operation durations.

Can I register alternative machines?

Yes. Each operation can have a main machine and alternatives, so planners can redistribute the queue when a machine is down or overloaded.

Put the right way to make it in the system, not in someone’s memory.

Leave your contact and we will schedule the demo at the best time for you.

Prefer to talk now? WhatsApp · (43) 99109-5035

No cost and no commitment. We only use your data to reply to this contact.